flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM and DOE unveil 3D-printed, off-the-grid building

Modular Building

SOM and DOE unveil 3D-printed, off-the-grid building

The Additive Manufacturing Integrated Energy (AMIE) building features a high-performance shell with a photovoltaic roof and built-in natural gas generator.


By Mike Chamernik, Associate Editor | September 23, 2015

The AMIE building, unveiled by the Oak Ridge National Laboratory at the DOE’s Industry Day event. Images courtesy SOM

The Department of Energy’s Oak Ridge National Laboratory has unveiled a 3D-printed building at the DOE’s inaugural Industry Day event on Wednesday.

Designed by Skidmore, Owings & Merrill (SOM), the 38x12x13-foot Additive Manufacturing Integrated Energy (AMIE) building can be used for off-the-grid shelter.

A photovoltaics roof works with a natural gas generator to provide lighting and power for the building’s micro-kitchen.

The enclosure conserves energy due to its high levels of insulated solid surfaces (79%) to glazed areas (21%). The battery of the attached 3D-printed vehicle provides supplementary power for the building. Using bi-directional wireless energy gets the building off the power grid at peak demand times.

AMIE condenses the functions of a conventional wall system (structure, insulation, air and moisture barriers, and exterior cladding, for example) into an integrated shell. This could lead to zero-waste construction, and it makes the buildings easier to be recycled and reprinted for other purposes.

Read more

 

Related Stories

| Feb 14, 2013

Boxman Studios launches shipping container buildings division

Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021