flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jun 12, 2018

Congestion pricing for cars is effective in reducing traffic, but a difficult sell

After three years, traffic congestion declined by 30% in London.

Codes and Standards | Jun 11, 2018

First RFP requiring modular construction on New York City housing project issued

Part of Housing 2.0 modular construction initiative.

Codes and Standards | Jun 6, 2018

Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract

LPCiminelli stops functioning as GC in fallout from the case.

Codes and Standards | Jun 6, 2018

LEED should be updated to combat climate change

Hasn’t kept pace with urgency of problem, says clean energy investor.

Codes and Standards | Jun 5, 2018

Sports stadiums and arenas showcase sustainability features

Green venues save owners money, gain positive publicity.

Codes and Standards | Jun 4, 2018

L.A. must transition to cleaner energy, boost transit to reach sustainability goals

City aims to reduce GHGs 60% by 2035 and 80% by 2050.

Codes and Standards | Jun 4, 2018

Washington D.C.’s flattened skyline can be a virtue

Zoning ordinance that ties building heights to width of streets dictates form.

Codes and Standards | May 30, 2018

Silicon Valley cities considering taxes aimed at large employers

The aim is to offset the impact on housing costs and homelessness by tech companies.

Codes and Standards | May 30, 2018

OSHA proposes new crane operator safety rule

Would provide long-term clarity on certification requirements.

Codes and Standards | May 29, 2018

Government support helping to drive demand for green building materials

Market projects to grow 12.5% annually between 2013 and 2019.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021