flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 1, 2018

ASHRAE publishes new energy simulation-aided design standard

Requires building energy modeling during schematic design.

Codes and Standards | Apr 30, 2018

CALGreen projects pre-approved for streamlined LEED v4 requirements

Reduces need to run additional energy models.

Codes and Standards | Apr 26, 2018

New standard supports community resilience

ASTM International guidance supports cost-effective ways to withstand and recover from disasters.

Codes and Standards | Apr 25, 2018

Lessons learned from decades of Superfund cleanups guide contaminated land reuse

Sites repurposed for residential, commercial use, and solar energy generation.

Codes and Standards | Apr 24, 2018

Vibrant downtown core the key for urban multifamily development

Nighttime activity makes the difference.

Codes and Standards | Apr 19, 2018

ILFI launches new Zero Carbon Certification

Offers greater flexibility around project fuel types and offsetting renewables.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021