flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | May 24, 2018

‘Amazon tax’ could slow Seattle’s construction boom

City imposes employer head count tax to fund affordable housing.

Codes and Standards | May 23, 2018

AAMA releases 2017/2018 fenestration market studies

Offers forecasts of industry trends.

Codes and Standards | May 22, 2018

Registration open for 2018 National Energy Codes Conference

U.S. Department of Energy event to be held July 15th-17th in Austin.

Codes and Standards | May 21, 2018

New standard tests quietness of floors

ASTM International method will help manufacturers test their flooring materials.

Codes and Standards | May 17, 2018

California will require solar panels on most new homes

Projected to add $10,000 to cost of new homes.

Codes and Standards | May 16, 2018

New resources offer tips on off-site construction

NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.

Codes and Standards | May 15, 2018

Blast testing of loaded mass timber structures yields positive results

Four tests covered a spectrum of blast loads.

Codes and Standards | May 14, 2018

Maryland makes general contractors liable for failure of subs to pay employees

GCs could have to pay for up to three times the wages owed.

Codes and Standards | May 10, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 9, 2018

OSHA and state safety agencies write more than 100 silica citations in 6 months

Actions tending to come with investigation of other site conditions.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021