flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Apr 2, 2018

Experts chosen for ICC, ANCR buildings resilience benchmarks project

Specialists to focus on community preparedness for disasters.

Codes and Standards | Mar 29, 2018

Contractors have paid $5.2 million for failing local resident employee mandate on Detroit arena

Companies were only able to meet half of the 51% local worker requirement over course of the project.

Codes and Standards | Mar 28, 2018

Washington State moving to promote mass timber construction with legislation

Bill would require all 12-story or less public buildings to be built with mass timber.

Codes and Standards | Mar 27, 2018

Los Angeles appoints its first chief design officer

Responsibility for enhancing civic architecture and urban design.

Codes and Standards | Mar 26, 2018

National Roofing Contractors Assn., releases updates to its Roof Wind Designer app

Significant changes to online wind-load calculator.

Codes and Standards | Mar 22, 2018

Global construction waste to almost double by 2025

Concerns in Houston, Minnesota over environmental impacts.

Codes and Standards | Mar 21, 2018

Cape Town, South Africa’s dire water supply crisis raises concerns in the U.S.

Los Angeles, Salt Lake City, and Miami among cities at risk for water shortages.

Codes and Standards | Mar 20, 2018

Report shows how LEED certification supports net zero energy

Whole-building energy simulation, ASHRAE compliance requirement are key factors.

Codes and Standards | Mar 15, 2018

Energy efficiency measures contributing to flat demand for power

Utilities having difficulty adjusting to new business environment.

Codes and Standards | Mar 14, 2018

New parking lighting technology is paying off, Energy Dept. says

Newer products can cut energy costs by as much as 70%.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021