flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Mixed-Use

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Tinaglia Architects designed the project.


By David Malone, Associate Editor | July 24, 2019
Arlington 425 aerial

All renderings courtesy Village of Arlington Heights/ Tinaglia Architects.

A $150 million, three-building mixed-use development is set to rise on a vacant parcel of land in Arlington Heights, a Chicago suburb about 30 miles northwest of the city. The Village Board recently approved the project, which will be the Village’s largest new development for Downtown in two decades.

Dubbed Arlington 425, the project includes a four-story, 54-unit residential building; a nine-story, 182-unit apartment building with the bottom two floors set aside for commercial space; and a 13-story, 125-unit apartment building that will include a six-story parking garage. The development will have a total of 361 units and over 44,000 sf of commercial space.

 

Rendering of Arlington 425 street level

 

An affordable housing plan was also agreed to that includes 18 affordable units (5% of the 361) for those at or below 60% of the area median income. The affordable units would be spread across two of the three buildings and include studio and one-bedroom floor plans.

The project will increase the parcel’s property taxes from about $40,000 a year to $1.5 to $2 million per year. Construction is not expected to begin until next spring at the earliest.

 

See Also: Shanghai’s T20 stacks office and community space atop a plant-filled parking garage

 

Tinaglia Architects designed the project. CCH LLC is the developer.

 

Arlington 425 highland building

Tags

Related Stories

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021