flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zurich defies center-core office archetype with stacked, cantilevered HQ

Office Buildings

Zurich defies center-core office archetype with stacked, cantilevered HQ

The top bar is 500 feet long, spans 180 feet between the bottom two bars, and cantilevers out 60 feet to the east.


By David Malone, Associate Editor | February 3, 2017

©James Steinkamp Photography

Spanning 783,800 sf across its 11 stories, Zurich’s new North American headquarters in Schaumburg, Ill., houses almost 3,000 employees and contractors in a “stacked bars” office complex. Designed by Goettsch Partners, with Clayco as the developer and design-builder, the LEED Platinum-certified building breaks free from the typical center-core suburban office form with a trio of rectangular boxes that are offset and stacked. The top bar is 500 feet long, spans 180 feet between the bottom two bars, and cantilevers out 60 feet to the east, directly on axis with downtown Chicago, 28 miles to the southeast. 

The HQ’s unusual arrangement offers numerous benefits, including optimal views of the surrounding landscape, improved solar orientation for amenities, and programmatic flexibility for Zurich. It also creates multiple spaces and amenities to encourage collaboration and wellness among employees, including green roofs, outdoor terraces, and a system of walking trails. 

The project’s interior designer and workplace strategist, CannonDesign, led an extensive workplace pilot program and employee survey project (1,300 responses were recorded) to optimize the design scheme. More than 150 employees spent three weeks testing four uniquely configured office neighborhoods, each with different styles of desks, chairs, enclaves, conference rooms, and informal meeting spaces. The final design, which incorporates adjustable sit/stand desks, a variety of formal and informal meeting spaces, and decentralized break areas, was selected based on performance and feedback, including increased interaction among teams, decreased waiting times, and more flexibility.   

Also on the Building Team: JLL (client’s rep.), WSP/Halvorson and Partners (SE), V3 Companies (CE), Thornton Tomasetti (sustainability consultant), and Hoerr Schaudt Landscape Architects.

 

©James Steinkamp Photography

 

​©James Steinkamp Photography

Related Stories

Office Buildings | Sep 19, 2018

Manhattan’s Meatpacking District has a new tallest tower

CetraRuddy designed the office building.

Office Buildings | Sep 17, 2018

TaylorMade Canada HQ includes golf laboratory and product showroom

ZZen Design Build was the general contractor for the project.

Office Buildings | Sep 5, 2018

Facebook’s new Frank Gehry-designed Menlo Park HQ extension includes a massive green roof

Level 10 Construction was the general contractor for the project.

Office Buildings | Aug 27, 2018

The open office isn't dead

The degree of open or enclosed doesn't matter in high-performing work environments. If the space is designed to function well, all individual space types are rated as equally effective.

Office Buildings | Aug 17, 2018

An elliptical office building goes with the flow in Boston

Exterior design cuts waste, saves energy, says Building Team members.

Office Buildings | Aug 14, 2018

Flexibility tops office workers' wish lists, followed by healthcare

A survey of 1,000 office workers in the US and UK found that men value health insurance above any other work perk, whereas women would prefer more flexibility in their office job.

Office Buildings | Aug 13, 2018

There's more to the open office than headlines suggest

A study found that contrary to popular belief, the open office did not encourage—but rather, inhibited—face-to-face communication.

Office Buildings | Jul 31, 2018

Office trends 2018: Campus consolidations bring people together

Companies create community-rich work environments where employees can thrive.

Office Buildings | Jul 25, 2018

New study on occupant comfort advances Saint Gobain’s design approach for renovation and new construction

The building products giant gauges its employees’ perceptions of old and new headquarters environments.

Office Buildings | Jul 18, 2018

A day in the life of an ‘agile worker’

When our Gensler La Crosse office relocated last year, we leveraged the opportunity to support an agile workplace strategy (aka, no assigned seating). Here’s what I’ve experienced firsthand.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021