flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

Giants 400

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.


By BD+C STAFF | December 3, 2020
2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

Photo: Gaëtan Bussy from Pixabay

   

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Top 45 Science & Technology Facilities Sector Architecture and AE Firms for 2020
  FIRM 2019 REVENUE
1 HDR $49,784,918
2 SmithGroup $42,644,554
3 Perkins and Will $31,508,770
4 HOK $29,259,000
5 Page $22,500,000
6 Skidmore, Owings & Merrill $17,597,921
7 SGA $16,514,202
8 TRIA $13,327,250
9 CannonDesign $12,000,000
10 EXP $11,295,975
11 EwingCole $10,800,000
12 BSA LifeStructures $10,583,465
13 Perkins Eastman $10,497,913
14 DGA $9,140,372
15 Clark Enersen Partners, The $8,844,964
16 Ayers Saint Gross $8,732,874
17 CO Architects $5,625,400
18 Flad Architects $5,391,000
19 HGA $5,164,162
20 LMN Architects $5,000,000
21 Huntsman Architectural Group $4,897,443
22 TreanorHL $4,600,000
23 BWBR $4,544,000
24 Hastings+Chivetta Architects $3,568,754
25 NBBJ $3,200,000
26 Architectural Resources Cambridge (ARC) $2,746,567
27 Clark Nexsen $2,700,000
28 MBH Architects $2,510,000
29 HLW $2,500,000
30 Gensler $2,211,090
31 HED $2,000,000
32 KGD Architecture $1,958,583
33 Alliiance $1,782,508
34 Ballinger $1,741,967
35 Ware Malcomb $1,703,756
36 Bergmann $1,500,000
37 RSP Architects $893,000
38 Margulies Perruzzi $889,855
39 Kirksey Architecture $830,711
40 Mithun $771,275
41 Urbahn Architects $677,662
42 YGH Architecture $524,640
43 Taylor Design $509,000
44 CPL $191,190
45 AHL $149,813
46 Leo A Daly $58,491
47 Ratio Architects $4,359

BD+C 2020 Giants 400 Report

 

Top 30 Science & Technology Facilities Sector Engineering and EA Firms for 2020
  FIRM 2019 REVENUE
1 Jacobs $155,000,000
2 Jensen Hughes $10,983,620
3 BRPH Architects Engineers $7,163,817
4 RMF Engineering $7,000,000
5 Vanderweil Engineers $6,300,800
6 KPFF Consulting Engineers $6,279,000
7 STV $3,507,364
8 Dewberry $3,474,828
9 Newcomb & Boyd $3,317,035
10 PS&S $3,228,000
11 Thornton Tomasetti $3,175,392
12 IMEG Corp. $2,896,698
13 RMH Group, The $2,170,155
14 CDM Smith $1,903,525
15 Syska Hennessy Group $1,780,453
16 M/E Engineering $1,436,365
17 Jaros, Baum & Bolles $1,398,116
18 NV5 Global $1,326,000
19 Arup $1,208,763
20 Mazzetti $1,102,926
21 Paradigm Structural Engineers $1,076,088
22 AKF Group $860,000
23 Bridgers & Paxton Consulting Engineers $800,282
24 SSOE Group $773,839
25 Peter Basso Associates $300,000
26 Dunham Associates $250,000
27 Osborn Engineering $225,000
28 Arora Engineers $208,133
29 Highland Associates $200,000
30 KLH Engineers $171,529
31 Milhouse Engineering and Construction $96,508
32 Wallace Engineering $50,000
33 Walter P Moore $24,597

BD+C 2020 Giants 400 Report

 

Top 25 Science & Technology Facilities Sector Contractors and CM Firms for 2020
  FIRM 2019 REVENUE
1 Turner Construction Company $355,370,930
2 DPR Construction $328,591,000
3 Whiting-Turner Contracting Company, The $267,633,449
4 Gilbane Building Company $181,237,000
5 Jacobs $88,169,000
6 McCownGordon Construction, LLC $82,032,154
7 Skanska USA $60,157,913
8 Messer Construction $55,609,097
9 Columbia $54,000,000
10 McCarthy Holdings $52,879,764
11 LeChase Construction Services $51,177,952
12 Swinerton $40,000,000
13 Barton Malow $34,369,566
14 BRPH Architects Engineers $11,989,183
15 Andersen Construction $6,400,000
16 Kraus-Anderson Construction $6,000,000
17 Donohoe Construction $5,186,812
18 Cumming $5,015,750
19 Hagerman Group, The $5,000,000
20 Russell Construction $5,000,000
21 STV $4,308,536
22 Fortis Construction $3,886,382
23 Robins & Morton $2,965,922
24 Hill International $415,243
25 W.E. O'Neil Construction $234,804

BD+C 2020 Giants 400 Report

 

 

BACK TO THE 2020 GIANTS 400 LANDING PAGE

Related Stories

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

MFPRO+ News | Aug 14, 2024

Report outlines how Atlanta can collaborate with private sector to spur more housing construction

A report by an Urban Land Institute’s Advisory Services panel, commissioned by the city’s housing authority, Atlanta Housing (AH), offered ways the city could collaborate with developers to spur more housing construction.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

Sustainability | Aug 14, 2024

World’s first TRUE Zero Waste for Construction-certified public project delivered in Calif.

The Contra Costa County Administration Building in Martinez, Calif., is the world’s first public project to achieve the zero-waste-focused TRUE Gold certification for construction. The TRUE Certification for Construction program, administered by Green Business Certification Inc. (GBCI), recognizes projects that achieve exceptional levels of waste reduction, reuse, and recycling.

Modular Building | Aug 13, 2024

Strategies for attainable housing design with modular construction

Urban, market-rate housing that lower-income workers can actually afford is one of our country’s biggest needs. For multifamily designers, this challenge presents several opportunities for creating housing that workers can afford on their salaries.

University Buildings | Aug 12, 2024

Planning for growing computer science programs

Driven by emerging AI developments and digital transformation in the business world, university computer science programs are projected to grow by nearly 15% by 2030.

Energy Efficiency | Aug 9, 2024

Artificial intelligence could help reduce energy consumption by as much as 40% by 2050

Artificial intelligence could help U.S. buildings to significantly reduce energy consumption and carbon emissions, according to a paper by researchers at the Lawrence Berkeley National Laboratory.

Sponsored | Healthcare Facilities | Aug 8, 2024

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.

Office Buildings | Aug 8, 2024

6 design trends for the legal workplace

Law firms differ from many professional organizations in their need for private offices to meet confidentiality with clients and write and review legal documents in quiet, focused environments

Data Centers | Aug 8, 2024

Global edge data center market to cross $300 billion by 2026, says JLL

Technological megatrends, including IoT and generative AI, will require computing power to be closer to data generation and consumption, fueling growth of edge IT infrastructure, according to a new JLL report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021