After construction of the Garrison Dam was completed across the Missouri River in Coleharbor, North Dakota, in 1956, Snake Creek National Wildlife Refuge (NWR) was established. When the 2.5-mile long dam was created to make the Lake Sakawea reservoir, Snake Creek NWR helped replace the important wildlife habitat that was lost when Lake Sakawea was filled. In 1967, Snake Creek NWR was renamed Audubon NWR to honor a local naturalist and wildlife painter. The lake spans 368,000 acres and provides food, space and shelter for a variety of wildlife species.
Problem
As a result of age, the building had developed and exposed some serious health and safety problems, including asbestos, extensive rodent encroachment, water leakage and mold. To continue to be able to serve and sustain the surrounding habitats, the outdated structure needed to be replaced.
Solution
To achieve the main focus of functionality and sustainability, roofing contractor Industrial Enterprises worked with Houston-based MBCI for the roof panels. Industrial Enterprises used 16,000 square feet of MBCI’s 24-gauge BattenLok® HS standing seam roof panel in Classic Green with a Signature® 300 finish. BattenLok® HS’s high strength structural SSR system was selected to resolve serious health and safety problems the building had acquired and earned LEED Gold certification in the process. BattenLok® HS is a mechanically field-seamed SSR system with a 2-inch tall vertical seam and is available in both 12- and 16-inch widths.
The construction of the Office and Visitor Center at Audubon National Wildlife Refuge was completed in August 2010. To earn its LEED certification, the building met a long list of standards for energy conservation, renewable energy production, water efficiency, the use of recycled materials, and indoor environmental quality and control.
Keplin-Gracon JV from Loveland, Colorado, worked as the general contractor and Industrial Enterprises, Inc. from Bismarck, North Dakota, was the roofing contractor. The building size was approximately 16,000 square feet and was funded through a Region 6 Multiple Award Task Orde Contract. Construction began in November 2009 and completed in April 2010.
Project Specs
MBCI Products: BattenLok® HS
Location: Coleharbor, N.D.
Color: Classic Green
Coverage: 16,000 sq. ft.
General Contractor: KeplinGracon JV, Loveland, CO
Roofing Contractor: Industrial Enterprises, Bismarck, N.D.
Related Stories
Sponsored | Metals | Sep 12, 2018
Austin apartment façade branded with metal mesh
Cambridge Architectural creates powder-coated design incorporating community’s leaf graphic.
Sponsored | Metals | Aug 8, 2018
Tiny house highlights ALPOLIC's versatility
As the exterior sponsor, ALPOLIC turned to Metal Design Systems (MDS) in Cedar Rapids, Iowa to come up with a way to fabricate its Timber Series metal composite material for this unique venture.
Sponsored | Metals | Aug 6, 2018
The state of the art in livestock housing
Metal buildings are proving to be a smart solution for livestock housing.
Sponsored | Metals | Jul 12, 2018
Metl-Span provides Liberty University with a home field advantage
In order to get the multi-purpose facility up and running in time for the team to begin preparations for the 2017 season, installers at W.H. Stovall & Company were tasked with fast-tracking the construction process.
Sponsored | Metals | Jul 10, 2018
Kent Police Station: Bridging a neighborhood, architecturally and symbolically
The station had to present an energized, neighborly aesthetic positioning it as a safe pillar of the community.
Sponsored | Metals | Jun 11, 2018
Perforated copper screens add movement to Ballet Memphis façade
The building is designed to engage the public in movement, culture and connection to the community.
Sponsored | Metals | May 9, 2018
Redefining Calgary’s newest social destination
Metl-Span® Insulated Metal Panels help bring Deerfoot City to life.
Sponsored | Metals | Jan 22, 2018
The Lyric 440K apartments: D.C. architecture takes a progressive turn
In searching for alternatives to expensive porcelain tile to achieve the look envisioned for the project, they turned to ALPOLIC® because of the company’s reputation for high quality and exceptional service.