The new Audubon National Wildlife Refuge Headquarters and Vistiors Center, completed in April 2010, earned LEED Gold certification.


By MBCI | January 13, 2016
Audubon National Wildlife Refuge & Visitors Center
Audubon National Wildlife Refuge & Visitors Center

After construction of the Garrison Dam was completed across the Missouri River in Coleharbor, North Dakota, in 1956, Snake Creek National Wildlife Refuge (NWR) was established. When the 2.5-mile long dam was created to make the Lake Sakawea reservoir, Snake Creek NWR helped replace the important wildlife habitat that was lost when Lake Sakawea was filled. In 1967, Snake Creek NWR was renamed Audubon NWR to honor a local naturalist and wildlife painter. The lake spans 368,000 acres and provides food, space and shelter for a variety of wildlife species.

Problem

As a result of age, the building had developed and exposed some serious health and safety problems, including asbestos, extensive rodent encroachment, water leakage and mold. To continue to be able to serve and sustain the surrounding habitats, the outdated structure needed to be replaced.

Solution

To achieve the main focus of functionality and sustainability, roofing contractor Industrial Enterprises worked with Houston-based MBCI for the roof panels. Industrial Enterprises used 16,000 square feet of MBCI’s 24-gauge BattenLok® HS standing seam roof panel in Classic Green with a Signature® 300 finish. BattenLok® HS’s high strength structural SSR system was selected to resolve serious health and safety problems the building had acquired and earned LEED Gold certification in the process. BattenLok® HS is a mechanically field-seamed SSR system with a 2-inch tall vertical seam and is available in both 12- and 16-inch widths.

The construction of the Office and Visitor Center at Audubon National Wildlife Refuge was completed in August 2010. To earn its LEED certification, the building met a long list of standards for energy conservation, renewable energy production, water efficiency, the use of recycled materials, and indoor environmental quality and control.

Keplin-Gracon JV from Loveland, Colorado, worked as the general contractor and Industrial Enterprises, Inc. from Bismarck, North Dakota, was the roofing contractor. The building size was approximately 16,000 square feet and was funded through a Region 6 Multiple Award Task Orde Contract. Construction began in November 2009 and completed in April 2010.

Project Specs

MBCI Products: BattenLok® HS
Location: Coleharbor, N.D.
Color: Classic Green
Coverage: 16,000 sq. ft.
General Contractor: KeplinGracon JV, Loveland, CO
Roofing Contractor: Industrial Enterprises, Bismarck, N.D.

Tags

Related Stories

Sponsored | Coatings | Aug 16, 2017

Architectural details offer endless inspiration

Railings, screens, canopies, and shading devices punctuate projects and are important aspects of the built environment.

Sponsored | Roofing | Jun 29, 2017

Metal roofs are soaring in popularity in the residential market

The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.

Sponsored | Metals | Jun 15, 2017

Inside-out cheese-making: 12,000-sf metal building features an unusual exoskeleton design

In order to maintain hygienic cleanliness inside the facility, smooth, continuous wall surfaces with a minimum number of joints, indents or protrusions is desirable.

| Jun 13, 2017

Accelerate Live! talk: Driving value through process innovation, Jonathan O'Leary, NCI Building Systems (sponsored)

NCI Building Systems’ Jonathan O'Leary discusses why AEC firms must rely on their partners to simplify the business process and minimize risk.

Sponsored | Roofing | May 24, 2017

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

Sponsored | Metals | May 22, 2017

Tapered columns can slim down costs

In many metal building applications, straight columns may have more steel than they need.

Sponsored | Coatings | May 5, 2017

Butler Tech Bioscience Center features hands-on learning in bold new building

Butler Tech students can now study and work in neighboring buildings that feature ALPOLIC metal panels coated in Valspar’s Valflon®. 

Sponsored | Metals | May 3, 2017

Steel protection methods

There are robust, well-proven ways to protect steel so it can perform up to its potential virtually indefinitely.

Sponsored | Metals | Apr 28, 2017

Colorful corrugated wall panels provide bright new look for community library

Approximately 2,600 sq. ft. of PAC-CLAD 7/8” Corrugated Panels in five different colors was just what the design team was looking for.

Sponsored | Coatings | Apr 27, 2017

Community center makes a statement in West Sacramento

It takes a team to find the perfect color combination, and this time we accomplished it with the help of CENTRIA.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021