In Austin, Texas, the seven-building East Riverside Gateway mixed-use development will provide a mixed-use community next to the city’s planned Blue Line light rail, which will connect the Austin Bergstrom International Airport with downtown Austin.
Planned and designed by Steinberg Hart, the development will include over 2 million sf of office, retail, and residential space, as well as amenities, such as a large park, that are intended to draw tech workers and young families. Currently home to a storage facility and a former mobile home park, the 22.5-acre triangular site is located at the terminus of the Riverside corridor.
The three office buildings will be placed around a central plaza. The four multifamily buildings will provide 1,100 residential units at a range of prices, from high-end condos to larger residences, in addition to more compact, attainable units and affordable housing. All seven buildings will be connected through a ground-floor retail corridor. The project also will have 4,000 parking spaces.
The master plan for the mixed-use development emphasizes the pedestrian experience, creating a walkable neighborhood and retaining the site’s numerous trees. The 3.5-acre urban park, which straddles the new development and its existing neighborhood, includes an area dedicated to the restoration of the area’s native Blackland Prairie habitat. Aiming to draw in pedestrians, the park’s programming will seek to inspire outdoor activities with a trailhead, bike path, playground, dog runs, and an outdoor pavilion area that can house events and performances.
The buildings will feature solar shading to minimize heat gain, double-height porches, and balconies. And landscaping at the podium level and throughout the neighborhood should provide a cooling reprieve from the Texas heat.
East Riverside Gateway is currently in the entitlement phase.
On the Building Team:
Owner (land): Artesia Real Estate
Developer: PlaceMKR
Design architect: Steinberg Hart
Landscape architect: dwg.
Preconstruction services (residential and office buildings): Bartlett Cocke, Austin Commercial, DCI Engineers, CEC, and V3 Consulting Engineers
Related Stories
Mixed-Use | Oct 7, 2024
New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment
Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Affordable Housing | Oct 4, 2024
3 new affordable housing projects for October 2024
As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.
Mixed-Use | Sep 19, 2024
A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood
Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Mixed-Use | Aug 21, 2024
Adaptive reuse of a Sears store becomes luxury mixed-use housing
6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.
Adaptive Reuse | Aug 14, 2024
Adaptive reuse revives a former warehouse in St. Louis
The Victor, as the building is now called, has nearly 400 residential apartments.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.