flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bronze Award: Lincoln High School Tacoma, Wash.

Bronze Award: Lincoln High School Tacoma, Wash.


By By Jay W. Schneider, Senior Editor | August 11, 2010
This article first appeared in the 200810 issue of BD+C.
Lincoln High School in Tacoma, Wash., was built in 1913 and spent nearly a century morphing into a patchwork of outdated and confusing additions. A few years ago, the Tacoma School District picked Lincoln High School to be the first high school in the district to be part of its newly launched Small Learning Communities program, thus beginning a $74.2 million renovation of the 222,000-sf high school.
      
Lincoln High School in Tacoma, Wash., was built in 1913 and spent nearly a century morphing into a patchwork of outdated and confusing additions. A few years ago, the Tacoma School District picked Lincoln High School, dubbed “Old Main,” to be the first high school in the district to be part of its newly launched Small Learning Communities program. The Building Team was given only 13 months to get the school ready to participate in the project.

Community members, administrators, students, teachers, and parents worked with architects from the Seattle office of DLR Group to reconfigure the high school for new academy-based educational delivery methods. The architects led them through extensive scenario planning, overlaying each educational program component over the building plans. 

  
Original stained glass skylights were restored and freed of decades of dirt and debris.
        
The north building addition contains classrooms, specialty learning environments, and the new Media Center. Repeating brick color and pattern, and closely matching the size and rhythm of the original windows, the new construction honors and supports the design intent of the original facility.
      
Classroom learning spaces are easily transformed based upon the need of the academy (top). Each Small Learning Community functions autonomously within the larger building and includes small group and teacher planning areas (above).
           
This process helped the community and school groups understand how various design options would affect educational delivery, and enabled them to zero in on the ideal adjacency, functionality, and organization.

The DLR plan divided the school into six zones (two zones in each wing, one on each floor) that would house six academies, each of which would function independently within the larger school building. Shared spaces were to include an auditorium, a cafeteria, a gymnasium, a library, and science labs.

Funding for the $74.2 million renovation came from a bond issue and a grant from the Bill and Melinda Gates Foundation. As work got under way in fall 2006, the existing 222,000-sf, L-shaped school received a number of structural upgrades and nips and tucks. 

To address seismic concerns, 13 shear walls (using double-sided plywood) were installed, running from grade all the way up to the attic floors. An existing 1980s addition was demolished; in its place arose a two-story structure that expands the school to 264,000 sf and houses the new library and science labs. The addition also acts as a buttress to the existing school structure, providing added seismic support.

The school received all new plumbing and electrical systems, as well as new HVAC equipment that was installed in the attic. The Building Team specified aluminum equipment to diminish the weight load on the existing wood-frame structure. Insulation was beefed up to dampen equipment noise.

Despite all that’s new with the school, much of its historic character remains intact. The Collegiate Gothic-style school’s original details were restored or replicated; some were relocated and reused in the addition to connect old and new. Also left intact were the school’s 75- to 80-year-old, three-by-seven-foot operable windows, some with original stained glass windows of Tacoma milk glass, so called because of its milky white color.
         

Project Summary
Lincoln High School
Tacoma, Wash.

Building Team
Submitting firm:
DLR Group (architect, structural engineer)
Owner: Tacoma School District
Architectural consultant: TCF Architecture
General contractor: Lease Crutcher Lewis
Electrical engineer: Coffman Engineers
Mechanical engineer: Hargis Engineers

General Information
Area: 264,000 sf
Construction cost: $74.2 million
Construction time: August 2006 to September 2007

Related Stories

K-12 Schools | Apr 7, 2017

Is an alternative project delivery method right for your K-12 school district?

With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.

K-12 Schools | Mar 9, 2017

The future of education facilities: Creating spaces where learning happens everywhere

The art of designing schools lies not in just understanding what makes a functional classroom, but in how successful we are in creating a wide array of educational options for teachers and students within the school environment.

K-12 Schools | Mar 9, 2017

School branding: The impact on identity and engagement

What is school branding and why is it important? HMC Architects’ James Krueger and Barbara Perez weigh in on the topic.

K-12 Schools | Feb 22, 2017

Through the principal's eyes: A look at K-12 architecture

Anderson-Livsey is a K-5 school located about 30 minutes East of Atlanta in Gwinnett County and has an enrollment of 785 students. 

K-12 Schools | Feb 8, 2017

'Fabrication Hall' introduces Wyoming high school students to career paths

The hall offers bountiful natural light with enough space to build large-scale projects.

Architects | Jan 19, 2017

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.

K-12 Schools | Dec 14, 2016

Expanding possibilities for America's K-12 schools

Bigger buildings, more outdoor space, and greater involvement from the private sector are among the trends marking the new generation of schools. 

K-12 Schools | Dec 12, 2016

Building a nation of super schools

AEC teams are being asked to design and build schools with enough flexibility to adapt to changing pedagogies.

School Construction | Oct 23, 2016

As construction rebounds, education sector spending flattens

Post-recession slump suggests a settling in at a “normal” level similar to the mid aughts.

Great Solutions | Aug 23, 2016

Novel construction approach speeds K-12 school projects

The Folia system uses pre-engineered components to deliver school buildings at 20% less cost. 

boombox1
boombox2
native1

More In Category



K-12 Schools

Designing for dyslexia: How architecture can address neurodiversity in K-12 schools

Architects play a critical role in designing school environments that support students with learning differences, particularly dyslexia, by enhancing social and emotional competence and physical comfort. Effective design principles not only benefit students with dyslexia but also improve the learning experience for all students and faculty. This article explores how key design strategies at the campus, classroom, and individual levels can foster confidence, comfort, and resilience, thereby optimizing educational outcomes for students with dyslexia and other learning differences.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021