flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Danish hospital is constructed from 24 steel frame modules

Modular Building

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.


By David Malone, Associate Editor | March 17, 2020
MARS Radiology equipment in modules

All photos courtesy FortaPRO

Forta PRO, a Latvian-based modular construction company, and MT Højgaard, a Danish construction company, recently completed the MARS Satellite Radiology Clinic building in Copenhagen, Denmark. The new clinic will provide additional acute care services to patients for faster and more advanced medical research.

The MARS clinic was built as a modular building off-site in Latvia and then shipped across the Baltic Sea to the assembly location. It combines 24 steel frame modules weighing up to 27 tons each. The most substantial blocks are equipped with all the necessary protection systems to provide safe and efficient operation for quicker patient diagnostics. The modules were designed to fit the most modern medical equipment such as X-Ray, CT, and MRI scanners.

 

FortaPRO module being lifted into place

 

Onsite construction was completed in only two weeks without disrupting neighboring working clinical departments or blocking traffic pathways for ambulances. By assembling the modules in a factory, onsite dust and noise was mitigated as compared to traditional construction.

 

See Also: China builds 645,000-sf coronavirus hospital in 10 days

 

 

MARS Radiology clinic exterior

Related Stories

K-12 Schools | Feb 25, 2015

Polish architect designs modular ‘kids city’ kindergarten using shipping container frames

Forget the retrofit of a shipping container into a building for one moment. Designboom showcases the plans of Polish architect Adam Wiercinski to use just the recycled frames of containers to construct a “kids city.”

Modular Building | Feb 23, 2015

Edge construction: The future of modular

Can innovative project delivery methods, namely modular construction, bring down costs and offer a solution for housing in urban markets? FXFOWLE’s David Wallance discusses the possibilities for modular.

Sponsored | Modular Building | Feb 23, 2015

Modular Space Showcase: Sales center brings curb appeal

The Welcome Center received rave reviews from the customer as well as community residents and potential buyers.

Sponsored | Modular Building | Feb 17, 2015

When lava flow in Hawaii threatens a public school district, officials turn to modular

Hawaii Modular Space, a Williams Scotsman company, designed temporary classroom space for the Pahoa and Keeau schools that would become displaced due to ongoing lava flow in Pahoa, Hawaii.

Modular Building | Feb 12, 2015

New shipping container complex begins construction in Albuquerque

The Green Jeans Farmery already has a hydroponic farm component courtesy of owner and entrepreneur Roy Solomon.

Sponsored | Modular Building | Feb 2, 2015

Modular Space Showcase: Getting down to business in Alberta’s oil sands

If you work in the energy sector you’ve heard of Alberta’s oil sands. Located in Western Canada, Alberta is a province with an abundance of natural resources.  Oil sands are located in three major areas of northeast Alberta spanning hundreds of thousands of miles. 

Sponsored | Metals | Jan 30, 2015

Want greater energy savings? The answer is right above you

A recent study finds that metal roofs can cut energy costs.

Sponsored | | Jan 26, 2015

Modular space showcase: Powerful space solutions for Ontario’s energy future

Having access to the right workspace is important, regardless of location. A comfortable, efficient and attractive workspace can make all the difference for workers. For Hydro One Networks, an electricity transmission and distribution company based in Ontario, establishing well-equipped field offices in various remote locations was essential to success. 

Modular Building | Jan 21, 2015

Chinese company 3D prints six-story multifamily building

The building components were prefabricated piece by piece using a printer that is 7 meters tall, 10 meters wide, and 40 meters long. 

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021