flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners and Lead 8 win design competition for Shanghai mixed-use complex

Mixed-Use

Goettsch Partners and Lead 8 win design competition for Shanghai mixed-use complex

The designers stressed walkability and green space to attract visitors.

 


By Mike Chamernik, Associate Editor | February 22, 2016
Goettsch Partners and Lead 8 win design competition for Shanghai mixed-use complex

All renderings courtesy Goettsch Partners/Lead 8

Two firms won a design competition for their concept for a Shanghai mixed-use development.

Goettsch Partners, an architecture firm based in Chicago, and Lead 8, a multidisciplinary architecture and design studio in Hong Kong, created a 264,000-sm complex that will have plenty of features to entice people to visit, work, or even live there.

The complex consists of two parcels. The western parcel will have five buildings that will contain 131,000 sm of office space, 54,000 sm of retail, 22,000 sm of apartment space, and a 5,000 sm cultural center. The eastern parcel has 45,000 sm of loft apartment space above a 15,000 sm podium. The complex’s 15,000-sm headquarters will also be located on the eastern side. Parks, indoor-outdoor workspaces, green walkways, fountains, and pavilions are also planned.

The development will be situated just north of the Shanghai Railway Station, which will connect the complex to the rest of the city. To accommodate visitors, the complex put a premium on a walkable layout. It will have above multiple bridges and below grade pedestrian routes that will link up with public transit systems and neighboring developments.

GP is leading the planning and design of the offices and residential buildings, while Lead 8 is handling the design and planning of the retail podiums. Construction is set to begin in the second quarter of this year.

 

Tags

Related Stories

Mixed-Use | Nov 17, 2017

Riverton will be the largest mixed-use project in New Jersey history

The 418-acre waterfront development will sit on the Raritan River.

Mixed-Use | Nov 1, 2017

18-story residential tower breaks ground near Temple University

The tower will provide apartment units for students and young professionals.

Mixed-Use | Oct 19, 2017

Mixed-use Dubai tower will have the world’s tallest ceramic facade

The 63-story tower will house a Mandarin Oriental hotel, residences, and restaurants.

Mixed-Use | Oct 6, 2017

Omaha gets its first entertainment district

Leo A Daly designed the mixed-use development, which takes advantage of a new city ordinance that allows alcoholic beverages outdoors.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

Mixed-Use | Sep 26, 2017

Perkins+Will designs new international business community in Cali, Colombia

The new free trade zone is designed to resemble a small village.

Mixed-Use | Sep 25, 2017

Getting there is half the fun: Mass transit helps entertainment districts thrive

In Los Angeles, the entertainment district L.A. Live is expected to benefit from the proposed expansion of the city’s mass transit system.

Mixed-Use | Sep 25, 2017

One of L.A.’s most sought-after neighborhoods receives a new mixed-use development

The new development will feature 166 units and 9,000 sf of ground-floor retail.

Mixed-Use | Sep 22, 2017

Defending against the online dragon

Some entertainment districts are going light on retail, partly because “the bulk of the leasing demand is for dining and entertainment,” say Barry Hand, a Principal with design mega-firm Gensler in Dallas.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021