flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Raleigh to start construction on convention center expansion

Events Facilities

Raleigh to start construction on convention center expansion

An amphitheater relocation and new hotel are included in a funding package approved by the county last year.


By John Caulfield, Senior Editor | May 8, 2024
Raleigh Convention Center in North Carolina
The convention center in downtown Raleigh, N.C., which opened in 2008, is being expanded by 300,000 sf to accommodate business growth. Image: Courtesy of the city of Raleigh, N.C.

The city of Raleigh, N.C., is ready to break ground on the $387.5 million expansion of its Raleigh Convention Center that will add 300,000 sf to the facility, bringing its total to 800,000 sf.

Scheduled for completion in 2028, the expansion will include 80,000 sf of flexible event space and 30 meeting rooms. It will also be the new home for the Red Hat Amphitheater, which is moving one block south from its current location into a 6,000-person capacity space. Red Hat's new digs should be ready by 2026.

Also see: Metros seeking far bigger convention center spaces

Raleigh is building a 550-key hotel across the street from the convention center. The city is developing this one-acre property with Preston Hollow Community Capital and Provident Resources Group. The hotel will operate under the Omni Hotels & Resorts banner, and include 55,000 sf of meeting space, several food and beverage outlets, a rooftop pool, and spa, and fitness center. The hotel is scheduled to open in 2027.

A joint venture consisting of Skanska, Clancy & Theys, and D.A. Everett is managing the construction of the convention center expansion, which was designed by TVS and RATIO Design. Cumming Group and Cate Services are the owner’s reps on this project.

A record boost in convention-related visitors

Raleigh Convention Center and Red Hat Amphitheater are part of The Complex, a group of convention and entertainment venues that also includes Martin Marietta Center for the Performing Arts, and the Coastal Credit Union Music Part at Walnut Creek. Combined, these venues attract over 1.3 million visitors annually. Kerry Painter, The Complex’s Executive Manager, said in a prepared statement that the vision for the convention center expansion “is to create a space that can be something for everyone––welcoming, accessible, smart, and convenient.”

Chris Whitley, Jr., a vice president with Cumming Group, added that the expansion is addressing “the growing demand from our community for larger, more versatile event spaces.”

Last August, Wake County (N.C.) commissioners approved the funding for this project, using tax money from hotel stays and restaurant meals. Thirty-two million dollars of funding will pay for the relocation of Red Hat Amphitheater. Another $75 million in funding will go toward the hotel’s construction.

TVS, which is based in Atlanta, designed the existing convention center, and Skanska completed its construction in 2008. The convention center includes a 150,000-sf exhibit hall, 20 meeting rooms totaling 30,000 sf, and a 32,000-sf grand ballroom that can seat 2,400.

The city stated that it chose TVS and RATIO Design to design the expansion because of their international design experience, according to Exhibitor magazine’s website. Exhibitor also reported that fiscal 2023 was a record-breaking year for Raleigh Convention Center, which booked over 100,000 hotel room nights from convention-related business in conjunction with the Greater Raleigh Convention and Visitors Bureau.

Related Stories

Events Facilities | Feb 23, 2021

Plans for Populous-designed performance venue unveiled

The venue will host events ranging from music and entertainment to eSports competitions.

Events Facilities | Feb 22, 2021

Weiss/Manfredi designs $250 million expansion for Longwood Gardens

The project will transform 17 acres of the core conservatory area.

Esports Arenas | Jan 25, 2021

6,000-seat eSports arena begins construction in Shanghai

The NCC&Esports Center is slated for completion at some point in 2024.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Convention Center Sector Giants: Top architecture, engineering, and construction firms in the U.S. convention center sector

AECOM, Gensler, and Jacobs head BD+C's rankings of the nation's largest convention center sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Events Facilities | Oct 12, 2020

Miami Beach Convention Center renovation and expansion completes

Fentress Architects designed the project.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Coronavirus | Apr 9, 2020

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

Events Facilities | Jan 15, 2020

UPDATED: New details released for Universal Studios Japan’s Super Nintendo World

The project is currently under construction in Osaka, Japan.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021